[single-projects.php- line: 140 ] Slide Image Count is: 1

Inconspicuous Integration

ABOUT THE PROJECT

This urban abode required that the Electronics Design Group (EDG) team develop a collaborative relationship with a number of trades working on the job site in order to ensure the delivery of a pre-defined system to the client.

With this particular home, the main objective was to integrate a state-of-the-art electronics system into an incredibly ornate home without disrupting its appearance. The clients stressed the importance of finishing on time so the rest of the project’s production schedule would not be affected. EDG worked very closely with all the trade partners to ensure the audio/video, light/shade & control elements had a synergistic relationship with all of the design elements.

  • PROJECT TEAM

    Architect:
    LiMN Architects

    Builder:
    Flower Construction

    Interior Designer:
    VHZ Design Group

  • Please fill out this form to get a PDF copy of this guide.

  • ANY INFORMATION COLLECTED IN THIS MANNER IS NEVER SHARED WITH ANYONE UNLESS EXPRESSLY REQUESTED BY THE USER. WE DO NOT SELL OR REVEAL USER INFORMATION TO ANYONE.

  • Contact Us

    ANY INFORMATION COLLECTED IN THIS MANNER IS NEVER SHARED WITH ANYONE UNLESS EXPRESSLY REQUESTED BY THE USER. WE DO NOT SELL OR REVEAL USER INFORMATION TO ANYONE.

  • Description of Project: